East Broadway Avenue Road Rehabilitation between Glade Street and 5th Street, Muskegon Heights, MI
Phase Three Construction Start: March 2026 Phase Three Construction End: July 2026
PROJECT PROFILE
Broadway Avenue
- 3,000 ft of road reconstruction
- 1,000 ft of 12-inch storm sewer
- 4,100 ft. of 4-inch to 16-inch water main
- 26 lead water service line replacements
- Miscellaneous Sanitary Sewer improvements
What Is Being Done?
- Asphalt Removal and Replacement
- Sidewalk and Curb Removal & Replacement
- Drainage Structure Adjustments
- Restoration
- Replacement of Water Mains
- Lead Service Line Replacement
How Will Traffic Be Impacted:
For convenience and to cause minimum disruption to the residents of Muskegon Heights, the project has been
constructed in three phases. This is the final phase of the project.
- Broadway Avenue will be closed to thru traffic at Glade Street and at 5th Street
- Broadway Avenue access will be closed off to all side streets except Temple Street and 6th Street
- The posted detour for Broadway will run along Glade Street to Summit Avenue to Peck Street to Broadway
- During construction, when driveways are inaccessible, we encourage residents to park on side streets.
- Traffic to businesses and residents will be maintained utilizing side streets and alleys.
- Pedestrian traffic will be detoured as necessary.
Contractor: McCormick Sand
24-hour Emergency Contact: Rob Murphy, 231-740-8894
City of Muskegon Heights Contact:
Khi Guy, Public Works Director, 231-332-6762
Josh Allen, Utilities Director, 231-955-0050